Wood Beton Spa company planned a wood bridge with only a span

of 82mt and contacted us in order to put it down.

 

The launch of the bridge involved a close analysis of the forces involved.

 

Basing on the requests of the company in cooperation with our technical department we designed and planned nr. 2 couples of lifting tackles

with nr. 5 wheels with a loading capacity of 100t per each.

Realized in steel with swivel eye, the nr. 4 lifting tackles had been

completed with 920mt of metallic rope with a diameter of 20mm.

 

As you can see, the lifting tackles had properly carried out their work.

For further curiosity please, consult the web site Wood Beton